SGM3000 Series Smart Meters
User Manual
62
GEH-7111-1.00-2
Restricted
6.1.2.3 SGM3022 Terminals
The SGM3022 meters require two line and two neutral terminals, a load control terminal, and a
micro-generation terminal.
The SGM3022 single phase meters are available in four primary terminals, one load control
terminal, and one micro-generation terminal arrangement.
The 32 A load control terminal is located on the right hand side of the meter, and the micro-
generation terminal is located on the left hand side of the meter.
The SGM3022 single phase meter are available in the following configurations:
•
Line(in)-neutral-neutral-line(out) configuration
•
Line(in)-line(out)-neutral-neutral configuration
Figure 11 SGM3022 Terminal Connections
6.1.2.4 SGM3023 Terminals
The SGM3022 meters require two line and two neutral terminals and two load control
terminals.
The SGM3022 single phase meters are available in four primary terminals and two load control
terminals.
The 32 A load control terminal is located on the right hand side of the meter, and the 2 A load
control terminal is located on the left hand side of the meter.
The SGM3022 single phase meter are available in the following configurations:
•
Line(in)-neutral-neutral-line(out) configuration
•
Line(in)-line(out)-neutral-neutral configuration