51
Check Hydraulic Oil Level
CAUTION
To avoid personal injury:
First lower all attachments on
the ground then stop the engine
and remove the key.
IMPORTANT:
Before filling oil, wipe away all sand and
dust from around the oil port. Make sure
you use an identical type of hydraulic
fluid.
The excavator has been filled with
hydraulic fluid before delivery. See
“RECOMMENDED OILS”. (Do not mix
different oils!)
1.
Park the excavator on a firm, flat and
level surface.
Adjust the swing angle to the center.
Pull in the arm completely.
Pull in the bucket completely.
Lower the attachments and dozer blade
to the ground and stop the engine.
Track width increases [16 in. (1240
mm)].
2.
Check the oil level as to whether it lies
on the center of the gauge at normal
temperature (10 to 30ºC).
3.
Enough oil is present if the oil level lies
between the markings.
4.
Should the oil level be too low, fill oil
through the oil port before starting the
engine. This step is important for the
protection of the hydraulic system.
3
Summary of Contents for A23S
Page 1: ...VERSION 09042022 POWER BY A23S A25SE CRAWLER EXCAVATOR OWNER S HANDBOOK...
Page 2: ...NOTE PAGE...
Page 9: ......
Page 16: ...7 6 DANGER WARNING AND CAUTION LABELS 1 Code No RA238 5748 2 2 Code No RA228 5733 1...
Page 17: ...8 1 Code No RC418 5753 2 2 Code No RA228 5762 1 3 Code No RD517 5795 2 Both sides...
Page 21: ......
Page 24: ...15 DESCRIPTION OF MACHINE PARTS...
Page 25: ...16 INSTRUMENTPANELANDCONTROLELEMENTS...
Page 26: ...17...
Page 28: ...19...
Page 43: ...34...
Page 53: ......
Page 64: ...53...
Page 70: ...59...
Page 71: ...60...
Page 72: ...61...
Page 73: ...62...
Page 74: ...63...
Page 75: ...64...
Page 76: ...65...
Page 78: ......
Page 83: ...70...
Page 92: ...79...