Setting
Block
NOTE: Seal the INSIDE of the
“ ”
before installing the
panel on the roof with silicone.
Seal outside after the
panels are installed.
13. ROOF PANELS
Start off the same way as the sidewalls – peel back the protective coating, mark the corner with
a marker so you know which side is out. Apply foil tape, ventilated for the bottom / solid for
the top
(you can do all the panels before hand or 1 at a time)
.
NOTE: The panels below the vents have an aluminum “ ” on BOTH ends. All long panels have an
aluminum “ ”on the bottom only.
Take an aluminum “ ” and put it on the bottom of the panel, do not forget the setting blocks
(see pic on previous page), push the panel up to the ridge and slide under the ridge flange (if
the foam is sticking, spray it with a bit of water). Square the greenhouse up to the panel and
fasten the cap using #8 x 1/2” screws. At this time you can seal the roof panels with clear
silicone or wait until all the panels are place.
After the first panel is installed, continue with the second panel, etc.