Veriton Z2610G/Z2611G/Z2620G/Z2621G AIO Computer Service Guide
65
5.
Secure the hard drive bracket with the screw.
Reinstalling the Front Bezel and LCD Module
1.
Reinstall all the components by following the procedure from page 50 to page 62.
2.
For model with touch panel capability, reconnect the cable and secure the touch panel board to the
system with the screws.
Quantity
Color
Torque
Part Number
1
Silver
4.5 ± 0.5 kgf-cm
86.00K96.644
Quantity
Color
Torque
Part Number
2
Silver
4.5 ± 0.5 kgf-cm
86.00K96.644
Summary of Contents for Veriton Z2610G
Page 6: ...vi Veriton Z2610G Z2611G Z2620G Z2621G AIO Computer Service Guide ...
Page 16: ...8 Veriton Z2610G Z2611G Z2620G Z2621G AIO Computer Service Guide ...
Page 92: ...84 Veriton Z2610G Z2611G Z2620G Z2621G AIO Computer Service Guide 13 Select Yes to Restart ...
Page 95: ...Veriton Z2610G Z2611G Z2620G Z2621G AIO Computer Service Guide 87 ...
Page 96: ...88 Veriton Z2610G Z2611G Z2620G Z2621G AIO Computer Service Guide UMA Board ...
Page 97: ...Veriton Z2610G Z2611G Z2620G Z2621G AIO Computer Service Guide 89 ...
Page 98: ...90 Veriton Z2610G Z2611G Z2620G Z2621G AIO Computer Service Guide ...
Page 100: ...92 Veriton Z2610G Z2611G Z2620G Z2621G AIO Computer Service Guide Exploded Diagram ...
Page 116: ...108 Veriton Z2610G Z2611G Z2620G Z2621G AIO Computer Service Guide ...
Page 118: ...110eMachine EZ1800 EZ1801 EZ1810 EZ1811 AIO Computer Service Guide ...
Page 128: ...120 Veriton Z2610G Z2611G Z2620G Z2621G AIO Computer Service Guide ...
Page 130: ...122 Veriton Z2610G Z2611G Z2620G Z2621G AIO Computer Service Guide ...