AcerPower 6100 (V66M/H61) User’s Guide
5-136
IDE secondary channel slave, 3-7, 3-13
Installable applications software, 5-5
Installation precautions, 4-1
ESD precautions, 4-2
Post-installation instructions, 4-3
Preinstallation instructions, 4-2
Installing a DIMM, 4-12
Installing a PCI card, 4-7
Installing a processor card, 4-16
Installing additional memory, 4-10
Installing a DIMM, 4-12
Reconfiguring the system, 4-13
Removing a DIMM, 4-13
Installing and removing expansion
boards, 4-7
Installing a PCI card, 4-7
Installing ISA cards, 4-8
Installing ISA cards, 4-8
Installing McAfee VirusScan, 5-11
Installing optional components, 4-1
Installation precautions, 4-1
Installing additional memory, 4-10
Installing and removing expansion
board, 4-7
Removing and replacing the housing
cover, 4-4
Upgrading the processor, 4-14
Installing the Celeron processor, 4-21
Intel LANDesk Client Manager, 5-14
Administrator Version, 5-17
Setting up, 5-15
Using, 5-16
Internal cache, 3-6, 3-35
Introduction, 1
About this manual, 2
Conventions, 4
Overview, 1
J
Jumper and connector locations, 2-4
Jumper settings, 2-5
Jumpers and connectors, 2-4
Jumper settings, 2-5
Locations, 2-4
Onboard connectors, 2-6
L
LANDesk client manager, administrator
version, 5-17
Layout, 2-3
Load default settings, 3-41
LS-120 drive as, 3-12
M
Main board ID, 3-10
Main board S/N, 3-10
Major components, 2-2
McAfee VirusScan, 5-10
Download new versions manually, 5-
12
Installing, 5-11
Updating data files, 5-11
Memory test, 3-26
Memory/cache options, 3-35
C8000h - DFFFFh shadow, 3-37
External cache, 3-36
Internal cache, 3-35
Memory at 15MB-16MB reserved for,
3-36
Memory parity mode, 3-36
Modem ring-in function, 2-12
N
Network connection, 1-10
Num lock after boot, 3-26
O
Onboard connectors, 2-6
Onboard device settings, 3-21
Floppy disk controller, 3-21
IDE controller, 3-21