P3150/P3250/P3150 Refresh/P3250 Refresh
Confidential
4-7
6. Focus test
Procedure
- Test equipment: video generator.
- Test signal: analog 1024 x 768@60Hz
- Test Pattern: full screen or MEME Sony
Inspection item
- Focus check
Criteria
- From screen 2.36 M
via visual to check the focus, look at the entire
screen, focus shall be clear, crisp, and sharp
over the entire surface of the display
pattern.(Blur word on one of the corner after
adjustment is acceptable. However, the word
should at least be recognizable.)
7. Color performance
Procedure
- Test equipment: video generator.
- Test signal: DVI (HDMI) 720p,1080i
- Test Pattern: Master, In focus II or SMPTE RP-
133
* Please refer to 4-2 to enter service mode.
Use 720P & 1080i signal, master pattern to do
HDTV test. Color cannot discolor to purple and
blue. If the test result is discoloration or flicker
-
ing, please return the unit back to repair
centers.
Inspection item
- Check if each color level is well-functioned.
- color saturations
Criteria
- Screen appears normal. It should not have any
abnormal condition, such as lines appear on the
screen and so on.
- Color appears normal.
- It is acceptable to have few lines flashing at the
center and on the edge of 1080i image. How
-
ever, rest of the image should appears stable.
- RGBW should all appear normal on the screen
and sort from R -G-B-W.
- Color levels should be sufficient and normal.
SMPTE RP-133
InFocus II
/ 64 gray RGBW
Master
MEME Sony
Full screen
Summary of Contents for P3150 Refresh
Page 15: ...P3150 P3250 P3150 Refresh P3250 Refresh Confidential 1 8 Remote Control Layout ...
Page 19: ...P3150 P3250 P3150 Refresh P3250 Refresh Confidential 1 12 System Block Diagram ...
Page 20: ...P3150 P3250 P3150 Refresh P3250 Refresh Confidential 1 13 Bottom Cover Dimension ...
Page 27: ...P3150 P3250 P3150 Refresh P3250 Refresh Confidential 2 7 5 Disassemble Main Board Module ...
Page 121: ...P3150 P3250 P3150 Refresh P3250 Refresh Confidential 18 DC P3250 7 2 4 1 8 5 6 3 10 11 12 ...