H7530/H7530D
Confidential
2-3
2-37 Assemble Engine
Module
1. Screw 3 screws (as yellow circle) to
assemble the Engine Module.
2.Stick EMI Gasket (as green square).
2-38 Assemble Speaker and
Front IR Sensor Board
1. Screw 2 screws (as yellow circle) to
assemble the Front IR Board and IR
Cover on Front Cover.
Summary of Contents for H7530D Series
Page 18: ...Confidential 1 11 H7530 H7530D Remote Control Layout ...
Page 21: ...H7530 H7530D Confidential 1 14 Getting Started Connecting the Projector ...
Page 23: ...H7530 H7530D Confidential 1 16 System Block Diagram for H7530D ...
Page 24: ...Confidential 1 17 H7530 H7530D Bottom Cover Dimension ...
Page 103: ...H7530 H7530D Confidential III ASSY TOP COVER ...
Page 105: ...H7530 H7530D Confidential ASSY BOTTOM MODULE ...
Page 107: ...H7530 H7530D Confidential VII ASSY BOTTOM HOUSING ...
Page 119: ...H7530 H7530D Confidential XIX A K 13 6 17 16 15 18 11 14 8 9 12 1 2 4 7 ...