Disassembly Process
The disassembly process is divided into the following sections:
•
Main unit disassembly
The flowcharts provided in the succeeding disassembly sections illustrate the entire disassembly sequence.
Observe the order of the sequence to avoid damage to any of the hardware components. For example, if you
want to remove the Mainboard, you must first remove the Keyboard, and LCD Module then disassemble the
inside assembly frame in that order.
Main Screw List
Main Unit Disassembly Process
IMPORTANT:
Cable paths and positioning may not represent the actual model. During the removal and
replacement of components, ensure all available cable channels and clips are used and that the cables are
replaced in the same position.
NOTE:
The product previews seen in the disassembly procedures may not represent the final product color or
configuration.
Main Unit Disassembly Flowchart
Screw
Quantity
Part Number
M2*6
15
Remove External
Mounts before
proceeding
Remove
Upper Cover
Remove
I/O Board
Remove
Thermal Module
Remove
Main Board
Summary of Contents for DynaVivid Graphics Dock
Page 6: ...vi ...
Page 8: ...viii ...
Page 14: ...6 Chapter 1 ...
Page 17: ...Chapter 2 9 Screw List Step Screw Quantity Part No Main Unit Disassembly 2 6 15 ...
Page 18: ...10 Chapter 2 Removing the Stand 1 Slide the stand off the base of the graphics dock ...
Page 20: ...12 Chapter 2 4 Lift the graphics dock away from the monitor mount ...
Page 24: ...16 Chapter 2 4 Lift the I O board out ...
Page 33: ...Chapter 2 25 Replacing the Stand 1 Slide the stand onto the graphics dock mounting bracket ...
Page 34: ...26 Chapter 2 ...
Page 46: ...38 Chapter 5 MAINBOARD HEATSINK SCREW CATEGORY PARTNAME ACERPARTNO ...
Page 50: ......
Page 52: ...44 Appendix B ...
Page 54: ...46 ...
Page 55: ...47 ...
Page 56: ...48 ...