27
3. Install the ISP tool.
Note: If the F/W Upgrade use the same ISP tool as the EDID writing, you must close the EDID writing tool
before running the F/W Upgrade tool.
3.1 Copy the three file in one folder.
3.2 Double-click
to run the ISP tool.
3.3 Connect to the monitor. Click “Connect”. If the tool communicate with monitor successfully, the tool will detect the
flash type of monitor.
Summary of Contents for CB282K
Page 7: ...7 ...
Page 9: ...9 ...
Page 11: ...11 Prepare a rear cover and a key board and use the screws to lock the key board S6 ...
Page 13: ...13 Assemble the stand and base ASS Y S8 ...
Page 19: ...19 ...
Page 20: ...20 Remove the main board and power board Disconnect the cables S7 ...
Page 22: ...22 ...
Page 23: ...23 ...
Page 24: ...24 ...
Page 25: ...25 ...