104
Switch _LED& IR Module Removal
Prerequisite:
Mainframe Removal
1. Locate Power Switch & IR& LED Module (A) on front cover. (Figure 3-53)
2. Remove screws (B) from speakers.
3. Remove Power Switch _LED(C)& IR (D) cables from guides.
4. Remove Power Switch _LED& IR Module from guide (E, F) on front cover .
5. Remove Power Switch & IR& LED module from front cover.
Figure 3-53. Power Switch & IR& LED Module
Power Switch_ LED & IR Module Installation
1. Install Power Switch _LED & IR module (A) to front cover. (Figure 3-53)
2. Install Power Switch _LED& IR Module to guide (E, F) on front cover .
3. Install and secure screws (B) to Power Switch _LED& IR Module.
4. Install Power Switch _LED(C)& IR (D) cables to guides
5. Install Main frame.
ID
Size
Quantity
Screw Type
B M3.0x5.0
1
A
B
C
D
E
F
Summary of Contents for Aspire Z1620
Page 1: ...Aspire Z1620 ...
Page 11: ...CHAPTER 1 Hardware Specifications ...
Page 48: ...CHAPTER 2 System Utilities ...
Page 64: ...CHAPTER 3 Machine Maintenance Procedures ...
Page 115: ...CHAPTER 4 Troubleshooting ...
Page 133: ...CHAPTER 5 Jumper and Connector Locaions ...
Page 141: ...CHAPTER 6 FRU Field Replaceable Unit List ...
Page 142: ...132 Exploded Diagram 134 Main Assembly 134 FRU List 136 Screw List 137 ...
Page 144: ...134 Exploded Diagram Main Assembly Figure 6 1 Main Assembly Exploded Diagram ...
Page 146: ...136 FRU List ...
Page 147: ...137 Screw List ...
Page 148: ...CHAPTER 7 Test Compatible Components ...
Page 149: ...139 Microsoft Windows 7 Environment Test 140 ...
Page 150: ...140 Microsoft Windows 7 Environment Test ...
Page 151: ...CHAPTER 8 Online Support Information ...
Page 152: ...142 Introduction 143 ...