5 System troubleshooting
126
Specific problems and corrective
actions
Listed below are specific problems that may arise during the use of
your server and their possible solutions.
Power indicator does not light.
Do the following:
•
Make sure the power supply module is properly installed.
•
Make sure the power cord is connected correctly.
•
Make sure that the wall outlet has power. Test it by plugging
another device.
•
Make sure the power indicator on the front panel is lit up green.
•
Remove all add-in cards and see if the system boots.
If reboot is successful, install the cards back in one at a time with a
reboot between each addition to determine if one of them is
causing the problem.
•
Make sure that you have properly installed system compliant
memory modules, and that they are populated according to the
system guidelines.
•
Make sure that you have installed system compliant processors,
and that they are populated according to the system guidelines.
HDD activity indicator does not light.
Do the following:
•
Make sure the drive is not disabled in the BIOS setup utility.
•
Make sure the drive is compatible.
•
Make sure you have not exceeded the power budget for the
server.
Summary of Contents for Altos R520 M2
Page 1: ...Acer Altos R520 M2 Series User s Guide ...
Page 14: ...xiv ...
Page 19: ...1 System tour ...
Page 35: ...17 54 U23 Broadcom BCM5221PHY chipset 55 U6 Intel 82576EB GbE chipset No Code Description ...
Page 43: ...2 System setup ...
Page 51: ...3 System upgrade ...
Page 95: ...4 System BIOS ...
Page 102: ...4 System BIOS 84 Processor Configuration ...
Page 108: ...4 System BIOS 90 Memory Configuration ...
Page 110: ...4 System BIOS 92 Advanced Chipset Configuration ...
Page 136: ...4 System BIOS 118 ...
Page 137: ...5 System troubleshooting ...
Page 149: ...Appendix A Server management tools ...
Page 158: ...Appendix A Server management tools 140 ...
Page 159: ...Appendix B Rack mount configuration ...
Page 160: ...This appendix shows you how to set up the Altos R520 M2 server in a rack mount configuration ...
Page 168: ...Appendix B Rack mount configuration 150 6 Fully extend the mounting rails on the rack ...
Page 172: ...Appendix B Rack mount configuration 154 ...
Page 173: ...Appendix C Altos eXpress Console ...
Page 174: ...This appendix provides information about the Altos eXpress Console utility ...
Page 214: ...Appendix C Altos eXpress Console 196 ...
Page 218: ...200 ...