4. Assembly and Disassembly Procedures (continued)
Remove two cushion foams, tear off the adhesive
tape, take out the LCD monitor from the EPE bag,
remove the screen protector, then put the LCD
monitor on a protective cushion.
Take out the whole cushion foams from the carton
and remove base and arm.
Take out all accessories including user’s manual,
power cable, D-Sub cable, DVI cable, audio cable
and other packing materials from the carton.
(Note: It depends on whether users return the
accessories.)
Open the carton with a proper tool.
S4
S3
S2
S1
4.2 Disassembly procedures:
Use a Phillips-head screwdriver to remove three
screws for releasing hinge.
(No.4~6 screw size=M4x9, Torque=11~13kgfxcm)
S6
S7
Turn over the LCD monitor to let the screen faced
up. Place a cloth on the panel where you are
working on to protect the panel. Then wedge your
fingers between the front bezel and the panel for
unlocking the mechanisms.
Use a Phillips-head screwdriver to remove three
screws for releasing the hinge cover.
(No.1 Screw size=M4x8; Torque=6-7kgfxcm)
S5
1
3
2
4
5
6
base
arm
USER’S MANUAL
POWER CABLE
AUDIO CABLE
D-SUB CABLE
DVI CABLE
UK CABLE
18
ACER A211H/A221HQ