V2.4
9 |
P a g e
ACE RELIANCE SENSOR OPERATIONS MANUAL
Figure 11. Tube cutter
4.TEC cable preparation
4.1 Use ACE Dual Seal cable strip gauge to measure and mark the cut-off length (fig 12)
Figure 12. Measuring and marking the TEC tube cut-off length
4.2 Use tube cutter to make a groove in the tube (fig 13)
Summary of Contents for Reliance 1K
Page 1: ...V2 4 1 P a g e ACE RELIANCE SENSOR OPERATIONS MANUAL ACE Reliance Sensor Operations Manual...
Page 8: ...V2 4 8 P a g e ACE RELIANCE SENSOR OPERATIONS MANUAL Figure 9 Vise grips Figure 10 Tube cutter...
Page 26: ...V2 4 26 P a g e ACE RELIANCE SENSOR OPERATIONS MANUAL Figure 43 SRU Optix set up menu...