Hero of Steel Manual
15
Installation and commissioning
Please check the accessory list to assemble components before installation;
After installation, plug the cable and turn on the machine to check whether each
part runs well. If no, immediately turn off the machine for troubleshooting.
Visual inspection
To safely use the machine, please check the following before startup:
Whether the warning sign is intact, visible and stuck correctly.
Whether parameters of power supply are consistent with the machine’s.
Whether screws of each component and components of the steering wheel are
loose.
Whether the connectors and terminals are loose.
Whether the machine is placed stably; whether the adjustment of the trundle and
the top foot is proper.
Whether the machine is placed properly.
Operation inspection
Whether the speaker works normally.
Whether the daylight lamp and the button light are on.
Whether the image is clear and normal.
Maintenance
Before operation, confirm the machine runs normally and then use it;
When there is dirt on the machine, wipe it with a soft cotton cloth with
detergent;
After the new machine has been used for one month, check whether each part
runs normally;
Often check the machine.
Cleaning
<I> Water filter and Sterilizing equipment flow chart