
10. Initial period setup 1
24
10.1
控制周期
-The high low temperature control cycle setup (in 01-99 second
scope may establish)
This part will involve the control sensitivity, the controller rests on gap time of cycle decision output
the hypothesis.
Example 1: SSR (voltage) outputs, the temperature control cycle is 1 second, the controller
demonstration output percentage is 40%, its significance is: SSR output ON 0.4 second,
OFF 0.6 second.
Example 2: SSR (voltage) outputs, the temperature control cycle is 2 seconds, the controller
demonstration output percentage is 50%, its significance is: SSR output ON 1 second,
OFF 1 second.
10.2 PID
設定
- PID Setup
Of contains the PID sub-area to cut P of the cut point hypothesis, various areas, I, D, ARW, the LMT
parameter hypothesis, this controller are most may plan 6 group of PID to utilize . After will press down
“the PID setup” the key to appear following picture:
1. Underneath click T1~T5, may defer to the systems
control condition the demand, plans the temperature to
cut the cut point voluntarily (T1~T5).
Temperature setup scope bound: - 200
℃
~300
℃
2. The setup break point are more and PID of region
use more, the control is also stabler.