background image

INSTALLATION 

Once the unit has been removed from its shipping container, it should be inspected for damage that may have 

occurred while in transit.  Immediately notify the carrier if any damage is found. 

1.

Provide minimum clearances as per table below.

2.

Position kettle in its designated area.  

Note

:  When positioning

 

kettle, do not use the plumbing connections.

Anchor the unit securely

3.

NSF standards require the base on the to be sealed to the table top to prevent seepage from accumulating

under the unit.  Use a good grade of silicone sealant.

Model Number 

Back of Unit Clearance 

Sides of Unit Clearance 

T

T-TT2/3J-T-E20QT &

TT-TT2/3J-T-E40QT

 

15.00” 

11.0” (minimum) 

Electrical Connection 

Check the electrical requirements of your unit as listed on the nameplate to be sure that your available power supply 

line is capable of powering the unit properly.  A junction box is provided for connecting the power supply line to the 

unit.  It is advised, and most electrical codes require, that an electrical cutoff device, such as a fused disconnect 

switch or equivalent, be installed in the power supply line between the main and the kettle.  All electrical connections 

must be in accordance with all applicable electrical codes.  The electrical wiring diagram is located inside the control 

housing. 

Caution

:  Kettle must be electrically grounded for safe operation.  For proper grounding procedures see local codes 

or, in the absence of local codes, the National Electrical Code  ANSI/NFPA 70-1993 (latest edition).   

Water Fill Instructions 

Refer to illustrated figure.

 

Warning!  After start-up use pure distilled water (free of chlorides) only.  Do not use tap water to refill to correct 

water level. 

1.

Allow kettle to cool.  Never attempt to add

water to a hot kettle.

2.

Lift the safety valve lever to release any

residual steam contained in the steam jacket.

3.

Place the thermostat in the off position.

Disconnect power at the customer supplied

electrical cut-off device.

4.

Remove pipe plug and place a funnel in

the inlet elbow.  (See illustration at left).

5.

Pour water  into funnel.  Lift safety valve

lever to allow air to escape from the jacket.

Continue adding water until water in the jacket

exceeds the minimum level. 

 DO NOT FILL BEYOND THE MAXIMUM LEVEL. 

6.

Remove funnel, replace pipe plug and secure tightly and restore power to the kettle.

Kettle Capacity 

20qt./5 gal 

40qt./10 gal. 

Gallon of Pure Distilled Water Charge (Quarts) 

11 

15 

2

Summary of Contents for EDGE ALTEH-5

Page 1: ...Made in U S A INSULATED SELF CONTAINED TILTING TABLE TOP ELECTRIC OWNERS MANUAL AND INSTALLATION INSTRUCTIONS Models ALTEH 5 and ALTEH 10 MODEL ALTEH 10...

Page 2: ...Calibrating Thermostats 5 Primary Thermostat Replacement 5 Heating Element Replacment 6 Trouble Shooting 6 Illustrations 7 Caring for Stainless 8 Sanitizing 8 Parts List 10 Wiring Diagrams 11 11 12 20...

Page 3: ...for safe delivery to the customer until customer acceptance of the package Careful inspection of the packaging and the appliance should be completed before acceptance from the transportation company...

Page 4: ...n the main and the kettle All electrical connections must be in accordance with all applicable electrical codes The electrical wiring diagram is located inside the control housing Caution Kettle must...

Page 5: ...is particularly true if the unit is cold Keeping the cover closed during this heat up time will speed up the process If a new temperature is desired during the cooking operation turn the control therm...

Page 6: ...E Caution Be sure the main power supply switch is OFF before cleaning and or servicing Caution Use of any replacement parts other than those supplied or authorized by manufacturer voids all warranties...

Page 7: ...ected to the normally closed position with the enclosed tag marked normally closed 3 Disconnect and mark wire s connected to the common position with the enclosed tags marked common 4 Drain water in j...

Page 8: ...ng Install new element in coupling and reconnect wires to the contactor Make sure all covers are replaced after all repairs are completed Trouble Shooting The TT TT2 3J T E20QT and TT TT2 3J T E40QT k...

Page 9: ...to see if it is too low Contactor for dirt or corrosion on the contacts Uneven cooking due to cold spots For burned out open or loose heating elements See Service section for test and replacement pro...

Page 10: ...agents thoroughly with water wipe dry and then allow the surface to air dry Oxygen actually helps maintain stainless steel s protective surface Never use cleaners containing chlorides or quaternary s...

Page 11: ...valent to one that supplies 200 parts per million available chlorine Obtain advise on sanitizing agents from your supplier of sanitizing products Following the supplier s instructions apply the agent...

Page 12: ...408015 25 Contactor 25 amp 600V 2 408015 40 Contactor 40 amp 600V 2 408015 60 Contactor 60 amp 600V 2 430033 Transformer all volts 480 440 415 380 1 400749 1 Ground lug 14 to 6 2 406619 Fuse 2 amp 2...

Page 13: ...Wiring Diagrams ALTEH 5 10 GAL 208 240 3PH 11...

Page 14: ...Wiring Diagrams ALTEH 5 10 GAL 440 460 480 3PH 12...

Page 15: ...Wiring Diagrams ALTEH 5 10 GAL 380 415V 3PH 13...

Page 16: ...Maintenance Service Log Model No Purchased From Serial No Date Purchased Purchase Order No Location Installed Date Installed Date Maintenance Performed Performed By 14...

Page 17: ...rm the repair or replacement This warranty includes travel time not to exceed two hours and mileage not to exceed 50 miles 100 miles round trip but does not include post start up assistance or trainin...

Page 18: ...IMPORTANT SERVICE INFORMATION AccuTemp Product Inc Technical Customer Support Technician is available Monday thru Sunday 7 00am to 7 00pm EST...

Reviews: