5
UL Vertical Distance
Above Cooking Surface
End filler panels may be shipped loose for field installaton or are facory mounted to the hood. If fillers
are factory mounted to hood, skip this section.
1. Uncrate the hood and lay it on the floor with protective material between the hood and the floor.
. Bolt the filler panels together with 5/16 in. bolts from the hardware package.
3. Position the filler panels on the
hood and tack-weld them to the
appropriate side of the hood.
4. To allow for ease of cleaning,
caulk the external seams with
NSF Approved silicone caulk
(GE SCS1009, or its equivalent).
The caulk is not provided.
Note: Hood may be furnished with
finished end fillers when mounting
against a partial wall.
Fig. 4
Fig. 5
End Filler Panel Installation Instructions
End Filler Panels
Fig. 3
The hood hanging height is critical, hanging the hood at the
incorrect height may significantly reduce the ability for the
hood to function properly and may be in violation of codes.
The hood hanging height is given on the UL label located
on the inside of the hood on the end panel. The distance
given is from the front lip of the hood (shown in Fig. 4) to
the surface of the cooking equipment.
Hood Hanging Height
Use the installation procedure described on
page 4 for single island hoods; install and
level both hoods. After leveling, secure the
hoods together. Fasten the hoods together
using u-clips and bolts. (Fig. 6) Caulk this
joint with NSF Approved silicone caulk (GE
SCS1009 or its equivalent). The caulk is not
provided.
2. RAISE ALL HOODS INTO APPROPRIATE LOCATION
AND SUPPORT PER CONSTRUCTION PLANS.
3. FASTEN TOP ANGLES TOGETHER USING 1/4 in. BOLTS & NUTS (BY OTHERS).
4. FASTEN HOODS TOGETHER USING U-CLIPS, 1/4 in. BOLTS
5. CAULK ALL SEAMS AS NECESSARY.
& CAP NUTS AS INDICATED.
HOOD FRONT
1. REMOVE SUPPORT ANGLE ON OPEN END PANEL.
HOOD
ACORN NUT
BOLT
U-CLIP
CAULK
Continuous Capture Plenum Hoods
Fig. 6