3
7. Connect the discharge assembly to the pump using a section of 1-1/2” pipe.
(The parts were shipped loose to prevent breakage in shipment.)
8. Connect the discharge piping from the feeder to the chlorine application point
with 1-1/2” PVC pipe or hose. Include an isolation valve in the line.
9. Plug the power cord into an 110v receptacle.
10. If a chemical controller is utilized, plug the controller cord into the
controller’s 110v switched output.
11. If system is to run manually without a chemical controller, install jumpers as
shown in the electrical schematic on page 9 of this manual.