46
FC
D
F1
V
F2
E xa m p le o f fixtu re to a w oode n s tru c tu re:
1
2
3
4
1
1
4
1 N u t
2 W oode n s truc tu re
3 T h reade d b rac e
4 W ashe r
O n c e yo u ha ve ins ta lle d the fou r brac e s , tig hte n th e n uts w itho ut lo ckin g
th em , an d ins e rt th e w as he rs as illu s trate d in th e figu re:
1
3
4
1
1
4
2
5
5
1 N u t
2 S p ac e fo r han gin g b rack et
3 Th reade d b rac e
4 W ashe r
5 T-s e ctio n
5
5
3
3
6
6
Le vel th e u nit u sin g a s p irit le vel an d a dju s tin g th e n uts an d lo ck n uts o n
th e th reade d b rac es , k ee pin g a dista nc es o f 2 5÷3 0 m m b etw ee n th e
bo dy o f th e un it an d th e inne r s u rfa c e o f the fa ls e c e ilin g.
3
25 + 30 m m
9
8
6
3 Th reade d b rac e
6 H an gin g b rack e t
8 F a ls e c e ilin g
9 S p irit le ve l
D
= cardboard template.
FC
= central reference hole.
F1
= hole for securing the template to the unit.
V
= screws for securing the template to the unit (M5X16 for models
HCA(B)
22-29-35-42, HCA/4(B) 22-35-50
/ M6x16 for models
HCA(/B) 60-80,
HCA/4(B) 60-80-120
.
F2
= brace position reference hole.
Depending on the type of ceiling, the braces can be installed as illustrated in
the figure.
Summary of Contents for CVCX Series
Page 1: ...USER S INSTALLER S MANUAL CVCX Hydronic Cassettes CVCX...
Page 2: ...2...
Page 31: ...2...