Assembly Instructions / A238-H.. - A240-H..
5 Storage of new turbochargers and spare parts /
© Copyright 2022 Accelleron Industries. All rights reserved.
HZTL455311P0042_EN
Rev. B
May 2022
Fig. 15: Package with hygrometer
Every 6 months, the following measures are required:
u
Check the hygrometer (02) in the sight-glass. There is an opening (01) in the wooden crate which
allows this check to be carried out. When the display field has changed colour at the 70% level,
the maximum permissible humidity has been exceeded. In this case, the turbocharger must be in-
spected by a Accelleron service station and repacked.
u
Inspect the package for damage. If the package is damaged, the turbocharger must be inspected
by a Accelleron service station and repacked.
After every 3 years the following work steps must be performed by a Accelleron service station:
¡
Inspect the component
¡
Replace the desiccant agent
¡
Repackage the component.
NOTICE
70% field of the hygrometer has not changed colour
If the 70% field of the hygrometer (02) has not changed colour and the package is
undamaged, the turbocharger can be put into operation without any prior inspec-
tion by a Accelleron service station.
Unpacking the turbochargers
The corrosion protection effect ends after the material is unpacked from the VCI package.
To avoid the formation of condensation, the surroundings and the content of the package must have
the same temperature during unpacking.
Page
19
/
21
Summary of Contents for A200-H
Page 2: ......