10
POWERING
STEP 1
To set up temperature monitoring, plug the
male connector of the thermal probe into the
designated probe port located at the bottom
side of the fan unit.
STEP 2
To power the unit plug in the power, plug the
male connector of the corded power adapter
into the designated power port located at
the bottom side of the fan unit. Then plug the
adapter head into an outlet.
AIRTITAN T8 T8-N
Summary of Contents for AIRTITAN SERIES
Page 1: ...USER MANUAL USER MANUAL AIRTITAN SERIES CRAWLSPACE AND BASEMENT VENTILATION FANS ...
Page 2: ......
Page 23: ......
Page 24: ...www acinfinity com ...