4610-1 Issue 04
1
1.0 Index
1.0
Index
1
2.0
Item List
2
3.0
Specification
2
4.0
Getting Started
2
4.1
Overview
2
4.2
Assembly
4
4.3
Measuring Super Elevation
5
5.0
Operating the Gauge and Software
5
1
Turn on the Control Unit by pressing and holding the on button
(please refer to manufacturers instructions as control units can vary).
5
6.0
Maintenance
7
6.1
Before Each Use
7
6.2
Every 3 Months
7
6.3
Annual
7