NX Series Product User Manual
25
2. Align the positioning column of the first-layer cabinet with the positioning
hole of the hanging beam, and use M8*40mm screws to lock the cabinet and
the hanging beam. Use M8*40mm screws to connect and lock between the left
and right adjacent cabinets. When installing, pay attention to check the flatness
of the left and right cabinets, and lock and fix after confirming that they are flat;
Note: Use connecting blocks to install between large and small cabinets.
Mounting screw: cylindrical inner hexagon full thread machine screw M6*60mm
3. Install the cabinets of the second layer in sequence according to the above
operation methods, and use screws to lock the adjacent cabinets. When
installing, pay attention to check the flatness between the top and bottom and
left and right of the cabinet, and lock and fix after confirming that it is flat;
4. Repeat the above steps to complete the installation of all cabinet frames;
connecting block
Summary of Contents for NX Series
Page 1: ...NX Series Product User Manual NX1 5 NX1 8 NX2 5 NX3 7 Shenzhen Absen Optoelectronic Co Ltd...
Page 16: ...NX Series Product User Manual 15 Default 45 angle on both sides 540mm 240mm...
Page 17: ...NX Series Product User Manual 16 2 1 2 Module size drawing 240mm 270mm...
Page 42: ...NX Series Product User Manual 41 b The trim pieces of the screen composed of small cabinets...