background image

 

20 

 

same procedures to install the next spliced cabinet. 

 

 

 

 

 

 

Product Wiring

 

Power Supply Wiring

 

• 

Preparation before wiring 

Before connecting to power supply and switching on control signal to the entire 
screen, please carefully check the power supply and signal cable connections. Please 
carefully check the "L" line, "N" line and "PE" of 

each cabinet’s AC inlet, and ensure 

there is no short circuit between the three lines (Use multimeter to measure). 
 

• 

Power Supply Cabling Instructions 

Please calculate and select the power distribution box or socket type based on 
maximum power consumption. Please consult your power distribution box 

manufacturer to specifically match.Cabinet’s input voltage is 100

-240V/AC, and 

3X1.5m

m2 

power cable is used to connect from distribution box cabinets. 

 

• 

Cabinet terminal connection diagram 

Summary of Contents for N Plus Series

Page 1: ...1 N Plus Series User s Manual N1 8 Plus N2 Plus N3 Plus N4 Plus N4D Plus N5 Plus Shenzhen Absen Optoelectronics Co Ltd ...

Page 2: ...uction 12 Product Structure Electronic Components Details 12 Product Installation 16 Front Installation Rear Installation 16 Wall mounting Solution 17 Front Installation Instructions Wall mounting 18 Product Wiring 20 Power Supply Wiring 20 Power Cable Wiring 21 Network Cable Wiring 21 Maintenance 23 Preparation Tools 23 Module Front Rear Maintenance 24 Check for Power Supply Short Circuit 27 ...

Page 3: ...ions listed in this manual This product is for professionals use only This product may result in serious injury or death due to fire hazard electric shock or on dropping Please read this manual carefully before installing powering up operating and maintenance of thisproduct Follow safety instructions in this manual and on the product If you have any questions please seek help from Absen Beware of ...

Page 4: ...and easily reached This way in case of any failure the power can be promptly disconnected Before using this product check all electrical distribution equipment cables and all connected devices and make sure all meet current requirements Use appropriate power cords Please select the appropriate power cord according to the required power and current capacity and ensure the power cord is not damaged ...

Page 5: ...on please do not look directly at the lit screen from within a 1 meter distance Do not use any optical devices that have converging functions to look at the screen to avoid burning the eyes WARNING Beware of suspended loads LED lamps used in the module are sensitive and can be damaged by ESD electrostatic discharge To prevent damage to LED lamps do not touch when the device is running or switched ...

Page 6: ...s equipment has been tested and found to comply with the limits for a Class A digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the i...

Page 7: ...smooth display plane precision cabinet and module assembly and very strong structure N3 Plus N4 Plus N4D Plus N5 Plus N5D Plus Standard Cabinet Dimension is 1440X288X54mm N1 8 Plus N2 Plus Standard Cabinet Dimension is 1152X288X54mm The product is primarily used at hotel ballrooms TV stations commercial chain stores branded snack stores transportation hubs supermarkets banks churches airports rail...

Page 8: ...8 Product Dimensions Cabinet Size Module size 288mmx288mm ...

Page 9: ...840 3840 1920 3840 Gray scale bit 14 14 14 14 14 14 Contrast Ratio 5000 1 5000 1 5000 1 5000 1 5000 1 5000 1 Color Temperature K 6500 6500 6500 6500 6500 6500 Viewing Angle H V 140 120 140 120 160 140 160 140 160 140 160 140 Driving Type 1 38 1 27 1 18 1 18 1 18 1 10 AC Operating Voltage V 100 240 100 240 100 240 100 240 100 240 100 240 Power Consumption Max Avg W m 540 180 540 180 420 140 434 145...

Page 10: ...ype Stack Front Rear Installation Stack Front Rear Installation Stack Front Rear Installation Stack Front Rear Installation Stack Front Rear Installation Stack Front Rear Installation Certificate TUV CE RoHS UL FCC TUV CE RoHS UL FCC TUV CE RoHS ETL FCC TUV CE RoHS ETL FCC TUV CE RoHS ETL FCC TUV CE RoHS ETL FCC ...

Page 11: ...from the front ensuring easy and fast servicing and zero maintenance channel requirement Magnetic modules enable fast and convenient module installation and disassembly without screws Cabinets can be installed both horizontally and vertically The module can be rotated along with cabinets by 90 degrees for assembly rotating the module and cabinet together does not affect the viewing angle ensuring ...

Page 12: ... Product structure consists of two parts Cabinet and module Cabinet have two different type 864 288mm 3 modules width and 288 288mm one module width It can be easily combined into three kinds of cabinet size by the bolts 864 288mm 1152 288mm 1440 288mm which can application in different case ...

Page 13: ...ically Modular structure Magnetic modules Relative to the cabinet structure modules can be rotated by 90 degrees for installation so that the cabinet can be installed vertically or horizontally When installed vertically the module needs to be rotated by 90 degrees so as not to affect left and right viewing angle Data input Power input ...

Page 14: ...eiving card and hub card Up and down signal cable 0 3m length Left and right signal cable 1 5m length Up and down power cable 0 3m length Screen long power cable 10m length Receiving card Hub card Flat cable ...

Page 15: ...15 Packaging ...

Page 16: ...on floor installation using sub frame for fast installation as well as wall mounted installation Front Installation Remove the modules from left and right sides of the cabinet use M5x60 bolt at the front mounting holes to fix it to the steel structure After it is fixed properly connect power cables and signal cables and then put the removed modules back Rear Installation ...

Page 17: ...the 40X40 square tube bar When installing first fix 4 2 to 4 cabinets onto the sub frame and then mount the sub frame onto the steel structure or wall to achieve fast installation Note Front or rear installation can also be used for sub frame installation ...

Page 18: ...nting Solution Install cabinets onto the sub frame or fixed structure and then directly mount the sub frame onto the wall to achieve wall mounting installation Front Installation Instructions Wall mounting Step 1 ...

Page 19: ...e sub frame Step 3 According to the installation positions marked on the wall install M10 expansion screws Step 4 Install the cabinet Mount cabinets onto the wall corresponding to the M10 expansion screw positions and then lock M10 nut flat cushion spring washers Step 5 After wiring is completed insert modules back at the four empty corners Repeat the ...

Page 20: ...L line N line and PE of each cabinet s AC inlet and ensure there is no short circuit between the three lines Use multimeter to measure Power Supply Cabling Instructions Please calculate and select the power distribution box or socket type based on maximum power consumption Please consult your power distribution box manufacturer to specifically match Cabinet s input voltage is 100 240V AC and 3X1 5...

Page 21: ...th 2 cabinet columns and 4 cabinets for each column connected to power supply in series In this case use a 3X1 5mm2 power cable to connect from the distribution box or socket to the bottom of the cabinet Network Cable Wiring The network cable is connected from up to down in S shape Please calculate the resolution as per load range Please note that the load pixel range for each network interface is...

Page 22: ...22 ...

Page 23: ...23 Maintenance Preparation Tools ...

Page 24: ...e Front Rear Maintenance Module Front Maintenance Use front maintenance tool to take off module front maintenance tool front maintenance tool Use the screwdriver to take off the power supply and receiving card ...

Page 25: ...e screwdriver take off base screw 2 Rear service Remove these screws 1 After remove the back cover you can find the power supply and receiving card 2 Remove these screws you can take out the receiving card The power supply is inside ...

Page 26: ...26 3 Remove these screws you can take off the power supply ...

Page 27: ...er supply L N PE and DC output terminal VCC GND If there is a short circuit please carefully investigate the wirings Make sure all wirings are normal and only then connect power to operate the unit All rights reserved by Shenzhen Absen Optoelectronic Co Ltd Shenzhen Absen Optoelectronic Co Ltd reserves the rights to modify contents without any further notice ...

Reviews: