![Absco PPCK Assembly & Instruction Manual Download Page 15](http://html.mh-extra.com/html/absco/ppck/ppck_assembly-and-instruction-manual_453246015.webp)
FINAL CONSTRUCTION
REAR VIEW
DRILL 4.5mm HOLES IN THE
TOP CHANNEL AND SECURE
HINGES WITH COUNTERSUNK
SCREWS AND NUTS
ONCE THE UNIT
IS SECURED TO A
CONCRETE SLAB, YOU
MAY FIND THE UNIT IS RIGID
ENOUGH WITHOUT THE NEED
TO USE THE CORNER BRACES.
MOVE THE LID INTO POSITION, DRILL
4.5mm HOLES THROUGH THE
CHANNEL AND SHEET AND SECURE
WITH COUNTERSUNK SCREWS AND
NUTS
ANCHORS CONSISTING OF STEEL ANGLE, DYNABOLT, AND
NUT AND BOLT ARE AVAILABLE FROM YOUR ABSCO
STOCKIST. THIS IS THE RECOMMENDED METHOD OF FIXING
THIS UNIT TO A CONCRETE SLAB.
88D
(OPTIONAL)
DRILL HOLES AND
SECURE FOUR
CORNER BRACES
(PART 88D) WITH
TWO SCREWS
EACH.
- EACH ANCHOR CONSISTS OF ONE NUT, BOLT,
DYNABOLT AND STEEL ANGLE
- DRILL A 10mm HOLE INTO THE WALL SHEET
- DRILL A 10mm HOLE INTO THE CONCRETE
BOLT & NUT
STEEL
ANGLE
WALL
SHEET
SLAB
DYNABOLT
ANCHORING THE UNIT
D
D
replacement or refund for a major failure and for compensation for any other foreseeable loss or damage. You are also entitled
three business days to advise you of the assessment outcome of the claim, which may include your expenses incurred in making
ABSCO INDUSTRIES
ASSEMBLY INSTRUCTION MANUAL
SHED MODEL: PPCK
22-11-2017
Absco Industries
Pool Pump Cover: PPCK
PAGE 15