PAGE 2
ABSCO INDUSTRIES
ASSEMBLY INSTRUCTION - MODEL: 60303HK 04/07/16
Absco Highlander Shed
Model: 60303HK
INSTRUCTIONS
AND VIDEOS
GENERAL INSTRUCTIONS
A NOTE ON SAFETY
·
The site for the shed must be level. An uneven surface may result in misalignment of parts.
·
It is recommended that the shed be set on a 100mm rebated concrete slab and anchored
down appropriately (refer to last page for details). A flat slab with a chamfered edge can be
used but will not result in optimum results. IF USING A REBATE ENSURE ALL FRAME
UPRIGHTS ARE TRIMMED 25mm.
·
Anchor sets are not supplied as standard items with this product as some customers wish
to use their own anchoring systems.
·
Before commencing any assembly, read through these instructions in detail to gain a
thorough understanding of assembly methods and associated details.
·
Unpack the carton and carefully identify and check off all the parts against the parts
described and illustrated on the following pages.
·
Local Authority approval must be obtained prior to construction of the shed. Once you
have selected your site you will need to lodge a site plan to your local council
·
Some parts may have sharp edges. It is advisable to wear gloves when handling these
items and safety glasses if drilling holes. Sensible shoes are highly recommended.
·
Do not erect your shed in windy conditions, ensure that the shed is securely anchored
to a solid foundation immediately after construction is completed.
·
It is highly recommended to erect the shed with two or more people.
TOOLS REQUIRED
Normal: 4mm & 10mm
Masonry: 10mm
OPTIONAL
SITE PREPARATION
Normal: 3mm