![ABSCO SHEDS CYCHK Assembly & Instruction Manual Download Page 18](http://html1.mh-extra.com/html/absco-sheds/cychk/cychk_assembly-and-instruction-manual_3552622018.webp)
Absco Industries
Assembly Instruction Manual
LARGE GABLE SHED
N3/C1 FRAME KIT
FOR HIGHLANDER MODELS
Model: CYCHK
02/03/21
1.2
18
BRACING FOR NON-GABLE WALLS
3. Once the correct lengths have been determined proceed to fix them with tek screws at every second
corrugation as described in BOXING FRAME SECTIONS.
It is important that the open side of the portal frames have been boxed before mounting to the wall.
See the next page for detail.
NOTE: This wall bracing will have to cut to
suit from part C2100.
1. Take the cut-to-length framing for the non-
gable wall, and partially box them together,
do not tek screw yet
.
2. Place the unscrewed box section against
the wall, in the orientation pictured, and slide
the two pieces apart until they make contact
with the wall and the portal frame. This will
also be the case between portal frames.
The result should look similar to what is
pictured to the right.
Gable wall
80mm
Non-gable wall
Bracing installed on the non-gable wall between the
wall and a portal frame.
TIP 1:
Cut two lengths of timber to 870mm. These
will act as a height reference guide and
help hold the horizontal braces. This makes
installation much simpler and more effective.
TIP 2:
Take a single piece of wood at 890mm. This
will act as a height template to mark the
drilling positions when outside the shed to
fix the internal bracing.