background image

Absco Industries

Assembly Instruction Manual

ABSCO SPACE SAVER SHED

MODEL: 30082SECOK

3.00mW x 0.78mD x 1.80mH, 1.95mH

Model: 30082SECOK

20/09/2023

1.1

17  

 

 

FRONT PANEL ASSEMBLY (continued)

NOTE: The two holes required to connect the padbolt hasp for each door have not been pre-punched, to allow for

proper alignment. position each hasp centrally over the padbolt shaft, and drill 3mm holes and secure with screws

NOTE: Nuts and bolts (supplied) may be used instead of

pop rivets (supplied) by simply enlarging the hinge hole

sets in the jamb using a 4mm drill bit

91A

91A

A

B

Summary of Contents for 30082SECOK

Page 1: ...o library at Http www abscosheds com au watch videos At ABSCO Industries we are always looking to be number ONE so please let us know what you think of our instructions Feedback makes us better feedba...

Page 2: ...st be level An uneven surface may result in misalignment of parts The shed shall be erected on top of a reinforced concrete slab and anchored down appropriately illustrated on FINAL CONSTRUCTION page...

Page 3: ...TY 2 1915 X 773mm 43B STEEL SHEET 2 1 1 4 2 1 1 1915 X 773mm 43C STEEL SHEET STEEL SHEET 1915mm X 773mm X4L STEEL SHEET 1915mm X 773mm X4R STEEL SHEET 865mm X 773mm 43D STEEL SHEET 1785mm X 711mm 34A...

Page 4: ...ents COMPONENT DESCRIPTION PART No CHECK COMPONENT DESCRIPTION PART No CHECK QTY 55AL 55CL 55BL 81BL 81AL QTY 55CR 1 1 1 1 2 1 1 1 1 2 CHANNEL L 1496 5mm 58 9 CHANNEL L 1496 5mm 58 9 CHANNEL L 1496 5m...

Page 5: ...L 165mm 1 1 4 2 89C JAMB L 1725mm 90A JAMB L 1568mm 91A JAMB L 1120mm 88B LIP TRIM L 865mm CSJ 6 CHANNEL JOINER L 200mm 7 9 1 PSTKSGL DOOR FITTINGS PACK DOOR PADBOLT HASP 1 3 SELF TAPPING SCREWS PACK...

Page 6: ...ly tap the channel along the sheets until each end is neatly flush If you need to remove channels from the panels slide it off from the side Channel locks the shed panel into position without the need...

Page 7: ...the end of the channel where the JOIN text is marked Push down one side of the CSJ until you hear a click Step 3 Join the second channel to the CSJ by positioning the JOIN of the channel at the centre...

Page 8: ...HANNELS NOTE Some channels may have holes in them You will need to redrill holes where CSJ joining channel covers them Join together 12 x channel sections using 6 x channel joiners Part CSJ 2993mm 2 x...

Page 9: ...s Assembly Instruction Manual ABSCO SPACE SAVER SHED MODEL 30082SECOK 3 00mW x 0 78mD x 1 80mH 1 95mH Model 30082SECOK 20 09 2023 1 1 9 ROOF COMPONENT OVERVIEW ROOF COMPONENT OVERVIEW 88B 81A 88B 81A...

Page 10: ...CO SPACE SAVER SHED MODEL 30082SECOK 3 00mW x 0 78mD x 1 80mH 1 95mH Model 30082SECOK 20 09 2023 1 1 10 WALL COMPONENT OVERVIEW 43B 43C 43C 43B 34A X4L 34A X4R A B 22A 55C 91A 90A 91A 89A 89A 79A 55A...

Page 11: ...s Assembly Instruction Manual ABSCO SPACE SAVER SHED MODEL 30082SECOK 3 00mW x 0 78mD x 1 80mH 1 95mH Model 30082SECOK 20 09 2023 1 1 11 REAR PANEL ASSEMBLY 1x required 43B 43C 43C 43B SNAPT TE i SNAP...

Page 12: ...bly Instruction Manual ABSCO SPACE SAVER SHED MODEL 30082SECOK 3 00mW x 0 78mD x 1 80mH 1 95mH Model 30082SECOK 20 09 2023 1 1 12 SIDE PANEL ASSEMBLY 2x required X4L X4R SNAPT TE i SNAPT TE i SNAPT TE...

Page 13: ...ndustries Assembly Instruction Manual ABSCO SPACE SAVER SHED MODEL 30082SECOK 3 00mW x 0 78mD x 1 80mH 1 95mH Model 30082SECOK 20 09 2023 1 1 13 ROOF PANEL ASSEMBLY 43D 43D 43D 43D SNAPT TE i 81A 88B...

Page 14: ...0 09 2023 1 1 14 DOUBLE DOOR ASSEMBLY 58C 58C 58C 12A 58C 58A 58A A B 89C 58B A B SNAP T TE i SNAP T TE i SNAP T TE i SNAP T TE i Vertical door channels are installed in the opposite orientation compa...

Page 15: ...y Instruction Manual ABSCO SPACE SAVER SHED MODEL 30082SECOK 3 00mW x 0 78mD x 1 80mH 1 95mH Model 30082SECOK 20 09 2023 1 1 15 FRONT PANEL ASSEMBLY 89A 89A 55A 90A 79A 55C SNAPT TE i SNAPT TE i SNAPT...

Page 16: ...o connect the padbolt hasp for each door have not been pre punched to allow for proper alignment position each hasp centrally over the padbolt shaft and drill 3mm holes and secure with screws NOTE Nut...

Page 17: ...d NOTE The two holes required to connect the padbolt hasp for each door have not been pre punched to allow for proper alignment position each hasp centrally over the padbolt shaft and drill 3mm holes...

Page 18: ...H Model 30082SECOK 20 09 2023 1 1 18 PANEL CONSTRUCTION NOTE Take care to ensure that all wall panels are not upside down The top channels of each panel are pre punched for attaching roof sheeting The...

Page 19: ...0 09 2023 1 1 19 FINAL CONSTRUCTION Each anchor consists of one nut bolt M10 dynabolt and steel angle Drill a 10mm hole into the wall sheet Drill a 10mm hole into the concrete Bolt and Nut M10 4 6 S S...

Page 20: ...by the installation contractor Scaling of drawings shall not be undertaken 7 G Prior to commencing works on site the contractor shall verify the position of all services in the area to ensure that th...

Page 21: ...th the relevant provisions of AS1562 Steelwork 1 F The supporting slab foundation for the garden shed shall be of a minimum size indicated on the installation manual The top surface of the formed slab...

Page 22: ...ers wheelbarrows garden tools etc Storage items that might be adversely affected by any of the above conditions may require additional protection such as being sealed or covered by plastic sheets and...

Page 23: ...costs The benefits given by the warranty are in addition to your other rights and remedies under a law in relation to the goods or services to which the warranty relates The warranty applies to the e...

Reviews: