Absco Industries
Bike Shed Model: 23083XK-PTX
ABSCO INDUSTRIES ASSEMBLY INSTRUCTION MANUAL MODEL: 23083XK-PTX 17/07/19
20
DYNABOLT
NUT
STEEL
ANGLE
SLAB
WALL
SHEET
- EACH ANCHOR CONSISTS OF ONE NUT, BOLT,
DYNABOLT AND STEEL ANGLE
- DRILL A 13/32” HOLE INTO THE WALL SHEET
- DRILL A 13/32” HOLE INTO THE CONCRETE
- POSITION THE STEEL ANGLE
- PLACE THE DYNABOLT INTO THE CONCRETE HOLE & TIGHTEN
- SECURE THE STEEL ANGLE TO THE WALL SHEET USING THE REMAINING NUT & BOLT
- REPEAT FOR EACH ANCHOR LOCATION
ANCHORING OF SHED
LOCATION OF 4
CONCRETE ANCHORS
FINAL CONSTRUCTION
FIT 1x FAST007 HASP ON THE INSIDE OF 54R
WHERE THE FAST006 PADBOLT ALIGNS
LIFT LID UP AND FIT FAST073
CHAIN TO 61G CHANNELS AND 91L JAMBS
USING FAST014 SCREWS
TIP - LIFT LID TO HIGHEST
PREFERRED OPEN POSITION
AND FIT CHAIN TAUGHT
FAST073 CHAIN
FAST014
FAST014
INSIDE SHED
BOLT
AFTER FINAL ALIGNMENT AND ANCHORING
HAS BEEN COMPLETED. CLOSE THE LID AND
EXTEND THE LID PADBOLT UNTIL IT
CONTACTS THE FRONT CHANNEL. MARK
THIS CENTREPOINT AND DRILL A 10MM
HOLE.
TIP: IT’S EASIER TO DRILL A
13/32”
HOLE IN
METAL WHEN A SMALL DRILL BIT IS USED
FIRST.