12
ASSEMBLY
.
1. Attach the Pad Frame (#3) to the Base Frame (#3) using:
one Rotation Shaft (#10)
two M8*15 Button Head Cap Bolts (#36)
two Φ9*Φ16*1.6 Flat Washers (#44)
Note: Tighten all connections from Step 3. Set the X3S into the Bench’s cradle and the unit
ready to go.
STEP 3
36
44
4
1044 36
3