background image

Installation and Operating Instructions

ABS lifting station Nirolift & Sanisett

4. 

Level control

The float switches required for the twin unit Sanisett should be fitted into the collection tank at the correct level 

setting. (See Figure 4)

NOTE 

Press the float switch cable into the plastic swivel in the holding bracket at distance 

of 15 mm between the float switch housing and swivel. The Float must point away 

from the wall.

When float switches are installed, the Robusta pump(s) should be set to ”Hand” operation

 

 

The connection lines for the float switches should be connected in accordance with their designation Level 1 / 

Level 2 to the control panel in accordance with the circuit diagram by a qualified person.

4.8 

Installation of the control unit

ATTENTION 

The control unit should be fitted above possible flood level in a well ventilated room 
and in an easily accessible position. Protection Class of the control unit IP 54.

The control unit should be secured at all fixing points. The fixing holes are accessible after unscrewing the 

lower housing cover.

ATTENTION 

Do not drill through the housing of the control unit itself. 

NOTE 

A number of different control box models exist. Please check the wiring diagram/

instruction manual in the control box.

Commissioning

m

  The safety hints in the previous sections must be observed!

Before commissioning the unit should be checked and a functional test carried out. Particular attention should 

be paid to the following:

Have the electrical connections been carried out in accordance with regulations?
Is the motor overload switch correctly set?
Have the power and control circuit cables been correctly fitted?
Was the sump cleaned out?
Have the inflow and outflows of the pump station been cleaned and checked?
Is the direction of rotation correct - even if run via an emergency generator?
Are the level controls functioning correctly?
Are the required gates valves (where fitted) open?
Do the non-return valves (where fitted) function easily?

ATTENTION 

Before commissioning the collection tank should be cleaned of any large particles 

and filled with water. After commissioning the lifting unit is normally operated with 

the selector switch in position “Auto”.

-
-
-
-
-
-
-
-
-

Summary of Contents for Sanisett

Page 1: ...www absgroup com ABS lifting station Nirolift ABS lifting station Sanisett 1060 00 15975190GB 03 2006 Installation and Operating Instructions GB...

Page 2: ...5 1 4 Description 5 2 Safety 5 3 Transport 5 4 Set up and Installation 6 4 1 Installation of the collection tank 6 4 2 Installation of the submersible pump 6 4 3 Opening of the collection tank inlet p...

Page 3: ...pumping of wastewater and sewage in accordance with DIN EN 12056 from locations and areas below the backwash level m These lifting stations may not be used for the collection or pumping of flammable...

Page 4: ...Nirolift Sanisett 1062 00 Figure 2 Sanisett installation example and dimensions 1063 00 1064 00 Figure 3 Opening connection ports Figure 4 Sanisett float switch installation 1065 00 1066 00 Figure 5...

Page 5: ...ng stations of the Nirolift Sanisett consist of a synthetic collection tank which is waterproof in according with DIN EN 12050 2 together with a cover plate with odour preventing filter and lockable f...

Page 6: ...for reasons of the progress of construction work it is impossible to install the venting and pressure pipes before pouring of the concrete one has to use a polystyrene core between the tank and the in...

Page 7: ...g Insert the white plastic installation cover into the frame of the upper fitting The cover is only suitable for foot traffic See Figure 5 Adjust the upper fitting in the tank opening until the edge o...

Page 8: ...oles are accessible after unscrewing the lower housing cover ATTENTION Do not drill through the housing of the control unit itself NOTE A number of different control box models exist Please check the...

Page 9: ...al premises every three months in apartment blocks every six months in a single family home once a year In addition we recommend that a maintenance contract be taken out with a qualified company 6 2 G...

Page 10: ...ABS Production Wexford Ltd Clonard Road Wexford Ireland Tel 353 53 91 63 200 Fax 353 53 91 42335 www absgroup com...

Reviews: