
59
Scheduling mode setting
Scheduling is in accordance with the panel’s current time and date setting, therefore users must
first confirm whether the time settings of the panel is correct before executing this function.
Similar to self-consumption mode, users can select whether to feed-in power to utility grid. The
system’s default setting is not allow feed-in power; if feed-in power allowed is selected, users can also
select the limit on how much power to feed (1~5kW).
【
1
】
Add:
Add a new schedule.
When a new schedule is added, users can change the setting as below:
Frequency:
Daily, every work day, every Saturday, every Sunday, specify date.
Date:
The date can only be set when the frequency is set as specify date.
Time:
Enter the start and end time (24-hour) of schedule execution.
Action:
Select the action to execute for this schedule, charge or discharge.
【
2
】
【
3
】
【
1
】
【
4
】
Click to change the date and time
Summary of Contents for EnerSalvys AB-ESSINV
Page 1: ...3 4 5 kW EnerSalvis Energy Storage System User Manual...
Page 9: ...8 Smart meter ESS MET Model Dimensions mm ESS MET Width 343 Height 403 Depth 106...
Page 23: ...22...
Page 26: ...25...
Page 34: ...33 Equipped with two battery cabinets and 6 battery packs...
Page 52: ...51 Function menu Function menu Setting Meter Profile Information Function menu block figure...
Page 75: ...74 Figure 3 F...
Page 84: ...83 ER 137 BMS6 temperature too low BMS of battery pack 6 detects battery temperature too low...