preparatIons, InstallatIon and takIng Into operatIon
15
POWER SUPPLY
DESIGNATION
CONNECTION CODING
for 1 and 2
respectively
Current-carrying conductor phase 1
L1
Current-carrying conductor phase 2
L2
Current-carrying conductor phase 3
L3
Neutral
N
Protective earth
PE
PLEASE NOTE:
If desired, all
eMH3
model variants can also be connected and operated
on a single phase at terminal L1: However, in this case the rated output
for the wallbox will not be achieved.
PLEASE NOTE:
The ABL Wallbox is preset for a charging current of 32 A per sup-
ply cable by the factory. Should your domestic power supply provide
a lower or higher charging current, the preset current for the wall-
box must be adjusted accordingly before you replace the electronic
components cover and then take the wallbox into operation. Please
contact a qualified specialist repairer.
Please note that the rated current indicated on the product label and con-
figured in the firmware must under no circumstances be exceeded.
13. Replace the electronic components
cover inside the housing and fix it with
its torx screw (TX20 bit).
14. Flip the housing cover upwards so
that it clicks into the housing and lock
it with the triangular key supplied.
Activating the RFID function
The
eMH3
Wallbox has an integrated RFID Module, which is factory pre-set to 'deac-
tivated'. Should you wish to operate the wallbox with user identification to restrict or