EN - 12
BAL.0713.0 • 2019-02-11
6 Commissioning
TCS-FP
In order to be able to commission the TSi injection unit, the two hoses
and
must be connected to the corresponding
bottles. All other compressed air connections are mounted in the factory.
6.1 Transport and installation
1
Compressed air hose for pneumatic motor
2
Compressed air hose for wire cutter
3
Compressed air hose for injection unit
4
Suction hose (mounted)
5
Return hose
6
Return flow bottle
7
Non-return valve
8
Anti-spatter fluid bottle (full)
Fig. 3
Commissioning
NOTICE
• Please note that the non-return valve
is already attached to the suction hose
.
1
2
3
4
5
6
7
8
CAUTION
Risk of injury
Physical injury due to falling devices and add-on components.
• Use an appropriate lifting tool with load handling attachment for transporting and installing the TCS-FP.
• Avoid abrupt lifting and setting down.
• Do not lift the components over persons or other devices.
• Transport the components in an upright position.
• Wear your personal protective equipment: safety shoes with steel toe caps, protective gloves, safety helmet, ear pro-
tectors.
• Send bystanders out of the danger zone.
• Note the weight of the individual components.
3.1 Technical data on page EN-8
CAUTION
Risk of toppling
Physical injury or damage to components due to improper assembly.
• Disconnect the supply lines.
• Place the components on a suitable base (flat, solid, dry) on which they will not topple over.
Summary of Contents for TCS-FP
Page 4: ...DE 4 BAL 0713 0 2019 02 11 1 Identifikation TCS FP ...
Page 5: ...TCS FP 1 Identifikation BAL 0713 0 2019 02 11 DE 5 ...
Page 34: ...EN 4 BAL 0713 0 2019 02 11 1 Identification TCS FP ...
Page 35: ...TCS FP 1 Identification BAL 0713 0 2019 02 11 EN 5 ...
Page 64: ...ES 4 BAL 0713 0 2019 02 11 1 Identificación TCS FP ...
Page 65: ...TCS FP 1 Identificación BAL 0713 0 2019 02 11 ES 5 ...