7 Transport and installation
BRS-LC
7.9 Flow chart
Fig. 11
Flow chart
Clean
INPUT
Stroke down
= I?
Yes
No
Approach BRS-LC
Leave BRS-LC
OUTPUT
Air blast
= I
OUTPUT
Clamp
= I
Stroke = I
OUTPUT
WAIT 2 s
Stroke = 0
OUTPUT
INPUT
Stroke down
= I?
OUTPUT
Air blast
= 0
OUTPUT
Clamp
= 0
OUTPUT
Air blast
= 0
WAIT 0.5 s
WAIT 0.5 s
WAIT 0.5 s
Injection
RETURN
RETURN
Option
Injection
Subprogr.
Approach injection
Stroke = 0
OUTPUT
Stroke = 1
OUTPUT
Leave injection
Determine
cause
Yes
No
No
Yes
TIME OUT
t > 2 s
BRS-LC
ready?
OPTION
Recommendation
Cleaning time
user-dependent
min. 1.8 sec.
If BRS-LC has injection unit:
Check:
Air pressure, operating
voltage, etc.
corresponds to
air blast
Duration of injection.
User-
dependent
Activate mech.
3/2 directional
actuated
valve
position
position