ABICOOLER 1300
6 Commissioning
EN
-
11
6.2 Initial commissioning
6.2.1 Bleed the device
Proper cooling is ensured only if the entire cooling system has been bled. The device must bled at the time
of initial commissioning and every time the device is emptied.
NOTICE
Material damage due to unsuitable coolant
The use of unsuitable coolant can result in a limited cooling capacity and increased device wear.
The warranty does not cover damage to the device.
► Use BTC series coolant or a different ABICOR BINZEL coolant.
► When using a different coolant, ensure that it does not include aggressive, abrasive or resinous
components.
► Use only demineralized water (permitted operating tempe5 °C to +40 °C) or, after cleaning
the device, a mixture of 25% monoethylenglycol and 75% demineralized water (permitted operating
temperature −10 °C to +40 °C), if ABICOR BINZEL BTC coolant or other ABICOR BINZEL coolant is
not available.
NOTICE
Material damage due to contaminated or conductive coolant
The use of contaminated or conductive coolant can lead to damage and increased wear in the device.
► Keep the coolant tank cap closed.
► Flush the cooling system before refilling with BTC coolant or other ABICOR BINZEL coolant with clean
water to remove any deposits and contaminations.
► We recommend that you use a coolant filter (not included in the scope of supply).
► Regularly check the state of the coolant.
► Observe the recommended maximum conductivity of the coolant.
► Ensure that the coolant supply and return hoses have been correctly installed.
Coolant supply = blue-colored quick coupling, coolant return = red-colored quick coupling.
1
Switch off the device.
2
Plug in the power plug to establish power supply.
1
Remove the coolant tank cap and keep the coolant tank open until the
bleeding process is complete.
2
Fill the coolant tank to the maximum fill level mark with ABICOR BINZEL
coolant.
3
Connect the supplied discharge hose at the blue-colored quick coupling.