1. Use the base as a template to mark holes.
2. Place lid on top to check level. Double check
    your position is correct.

1

1. Tighten nuts to secure base down.
2. Attach hot and cold water pipes (use
    appropriate thread sealant).

3

5

Attach and bolt body to base.

6

1. Trim plastic housing to be level with floor
    structure (if required).
2. Secure water pipes appropriately.

4

1. Remove base, drill the holes into the
   concrete footing to a depth of 60mm.
2. Insert dyna bolts.

CONCRETE FOOTING

2

1.

1.

1.

1.

2.

2.

2.

Hot

Cold

2.

60

Connect shower head to Arm.

Note:

 Drainage not shown, please ensure drainage

is compliant with your local standard

Important!

There are many installation options for this product. We recommend consulting
your designer or plumber prior to commencing any works to determine the most
appropriate method for you.

 Please note this product must not be installed

encased in concrete to allow access to water connections.

 See examples of

correct installation methods below.  ABI's warranty is void if this product
is installed incorrectly or encased in concrete. 

Installation on top of

concrete slab

with 

timber decking

This installation in shown in

the following Install Guide

Installation on top

of concrete slab

with

 fine stone fill

,

decorative stone

and 

removable

paving

Installation on top

of concrete slab

with 

fine stone fill

and 

decorative stones

ABI'S WARRANTY IS VOID IF

THIS PRODUCT IS INSTALLED

INCORRECTLY OR ENCASED

IN CONCRETE.

WARNING!

Summary of Contents for SOLA 13329

Page 1: ...tio n h o w ever A B I a n d th e ma n u f a ctu rer d is trib u to r ta kes n o res p o n s ib ility f o r p rin tin g erro rs C o p yrig h t A B I I n terio rs 2 02 2 P ty Ltd SPECIFICATIONS RECOMMENDED USE Domestic MATERIAL 316 Stainless Steel TEMPERATURE RATING Maximum continuous working temperature 75 C If the water temperature exceeds 75 C an approved tempering valve must be fitted PRESSURE ...

Page 2: ...to commencing any works to determine the most appropriate method for you Please note this product must not be installed encased in concrete to allow access to water connections See examples of correct installation methods below ABI s warranty is void if this product is installed incorrectly or encased in concrete Installation on top of concrete slab with timber decking Th is ins t allat io n in s ...

Page 3: ...ot and cold water pipes use appropriate thread sealant 3 5 Attach and bolt body to base 6 1 Trim plastic housing to be level with floor structure if required 2 Secure water pipes appropriately 4 1 Remove base drill the holes into the concrete footing to a depth of 60mm 2 Insert dyna bolts CONCRETE FOOTING 2 1 1 1 1 2 2 2 Hot Cold 2 60 Connect shower head to Arm ...

Page 4: ...h cover plate down 7 1 1 1 2 8 Connect Arm to Body 1 Connect internal flexi hoses 2 Push together and use an alan key to fasten set screw Test and check all water points for leaks 9 1 Attach hand held shower head 2 Test and commission ...

Page 5: ... held Shower Head 8 Hose 9 Set Screw 10 20mm Bolt 11 90mm Dyna Bolt set 12 Alan key 6mm 13 Alan key 3mm x6 x10 DO NOT use cream cleaners or bleach These substances are abrasive Regularly clean with mild liquid detergent or soap and water DO NOT use cleaning pads with abrasive surfaces as this may scratch the material ...

Reviews: