Take out the beer machine from box.
You can find a tray and
Main seal at the bottom of the box.
1
Open Clamps of Machine.
2
Follow instructions.
3
Watch supplied Video DVD before assembling the machine.
You MUST do the pressure test before putting the
Machine for Brewing.
Assembling
beer machine
?
Assemble Spigot, Delivery Tube & Float in lower
part of Machine
?
Assemble Carbonation Unit in Upper Part of
Machine
?
Assemble Pressure Control Valve
?
Assemble Main Seal
(Make sure to keep it into warm water for
few minutes before assembling)
?
Final Assembly by sliding clamps
?
Operating Pressure Test
(Leakage Test)
(Make sure to follow the detailed instruction given in Video DVD)