background image

www.ABBALightingUSA.com

  b.  Check  that  the  pea  gravel  or  sand  fills  the  extra

space adequately, providing proper drainage around

the fixture. 

c.  Ensure  that  the  fixture  remains  level  and  stable

after the installation.

Step 5

: Test the water drainage: 

a.  Pour  a  small  amount  of  water  near  the  fixture  or

use a hose to simulate water flow. 

b.  Observe  the  drainage  around  the  fixture  and

ensure  that  water  flows  away  from  the  fixture  as

intended. 

c. Make any necessary adjustments to the pea gravel

or sand to optimize water drainage if needed.

Once the fixture(s) are securely installed, turn on the

power and enjoy the enhanced lighting experience!

We strongly recommend that the main cable from the

transformer  be  buried  underground  for  safety

reasons.  Additionally,  please  be  sure  to  avoid

exceeding  the  maximum  wattage  on  the  fixture(s)  to

prevent any damage or hazards.

3" Gravel

3" Gravel

Both sides

Below

Concrete

Main line 

WN12

(Sold separately)

3" Gravel

3" Gravel

Both sides

Below

Soil

Main line 

WN12

(Sold separately)

Reviews: