Date: 2021-01-13
Version: 1.2
Overhaul instructions
Central lubrication unit
Installation
Page 36 of 50
•
Place the plate (
4
) with the coarse filter unit on the container.
Figure 21: Fitting the lid
Item number
Designation
(
4
)
Plate
© 2021 ABB Automation GmbH |
en