Installation instructions for new buildings
The following should be ensured when setting up a reliable,
simple, economical and future-oriented ABB-Welcome
system:
»
The use of telecommunication cables J-Y(St)-Y in the
indoor and A-2Y(L)2Y in the outdoor area with a diameter
of 0.8 mm. In addition to the wire pair of the ABB-Welcome
2-wire bus, other pairs of wires can be kept as "reserve"
in the same cable. For example, for later connection to a
Busch-Watchdog movement detector in the outdoor area
or as power supply for future bus devices.
»
For smaller systems: Looping the internal bus from device
to device
»
For larger systems: Setup of a structure with a rising mains
and several stub lines. If two rising mains are provided, the
two internal bus lines can be used.
Part of daily life. The ABB-
WelcomeTouch in new buildings.
An ABB-Welcome audio system should make later
conversion to video easy. The conversion includes the
exchange of at least one ABB-Welcome audio outdoor
station with an ABB-Welcome video outdoor station and
at least one ABB-Welcome audio indoor station with an
ABB-WelcomeTouch. The system controller need not be
replaced.
For branch connections in the system, video distributors
must be installed for the conversion. These are not required
in the internal bus – if it is looped from device to device.
The setting of the terminal resistors of the system must be
checked after the conversion (See 20, Chapter 02).
03
Expert installation.
General information
for the installation of an ABB-Welcome
system in new and existing buildings. The installation of flush-
mounted and surface-mounted devices as well as MDRC units
is described in detail in the operating manuals of the devices.
30 Installation |
User Manual ABB-
Wel
come
Summary of Contents for Welcome
Page 1: ...Door Communication ABB Welcome User Manual...
Page 3: ...User Manual ABB Welcome 3...
Page 4: ...4 User Manual ABB Welcome Most welcome Intelligence with system...
Page 8: ...8 User Manual ABB Welcome...
Page 15: ...User Manual ABB Welcome Planning ABB Welcome systems 15...
Page 31: ...User Manual ABB Welcome Installation 31...
Page 37: ...User Manual ABB Welcome Commissioning 37...
Page 43: ...User Manual ABB Welcome Control 43...
Page 45: ...User Manual ABB Welcome Overview of Range 45...
Page 55: ...Notes...
Page 57: ......