Commissioning
System Manual
│62
6
Commissioning
6.1
Overview of commissioning
Commissioning in three sections
Commissioning of the ABB-Welcome IP system is carried out in three sections.
– Please observe the order of the steps. They are dependent on each other.
Step
1
Local addressing
– For local addressing the physical addresses
are assigned for each participant in the "ABB-
Welcome IP" system.
see chapter 6.2 “Commissioning of a system
— Step 1: Local addressing “ on page 63
Step
2
Initial commissioning of "Smart Access Point"
see chapter 6.3 “Commissioning of a system
— Step 2: Commissioning "Smart Access
Point"“ on page 83
Step
3
Searching and certifying
– Searching and automatic certification of all
available participants in the "ABB-Welcome
IP" system.
– Definition of trustworthy participants for door
opening (who can open the to whom).
– Data backup
see chapter 6.4 “Commissioning a system —
Step 3: Searching and certifying“ on page 102