30
Technical guide VUC
|
1ZSC000562-AAX en, Rev. 1
The diverter switch can participate in the drying process.
If the diverter switch has participated in the drying process
it is important that it is not maneuvered until it has been
submersed in oil, not even hand operated. For further
instructions refer to the Installation and commissioning guide.
Weights
Tables 14 and 15 shows all the weights of the VUC range of
tap-changers.
On-load tap changer type designation
Required
oil in kg
Selector C
Selector III
Selector F
BIL
Current
Without oil
Total
Without oil
Total
Without oil
Total
VUCG.N
380
450-800
185
344
529
440
625
570
755
650
450-800
185
354
539
450
635
587
772
1050
450-800
230
374
604
470
700
607
837
VUCG.T
380
450-800
555
942
1497
1101
1656
1260
1815
650
450-800
555
972
1527
1131
1686
1440
1995
1050
450-800
690
1032
1722
1191
1881
1500
2190
VUCG.B
380
450-800
370
658
1028
816
1186
1060
1430
650
450-800
370
678
1048
836
1206
1180
1550
1050
450-800
460
718
1178
876
1336
1220
1680
VUCG.E
380
450-800
185
314
499
367
552
420
605
650
450-800
185
324
509
377
562
480
665
1050
450-800
230
344
574
397
627
500
730
Table 16. Weights for type VUCG.
On-load tap changer type designation
Required
oil in kg
Selector III
Selector F
BIL
Current
Without oil
Total
Without oil
Total
VUCL.N
380
700-1300
260
495
755
625
885
650
700-1300
300
505
805
642
942
1050
700-1300
340
525
865
662
1002
VUCL.T
380
700-1300
780
1266
2046
1425
2205
650
700-1300
900
1296
2196
1605
2505
1050
700-1300
1020
1356
2376
1665
2685
VUCL.B
380
700-1300
520
926
1446
1170
1690
650
700-1300
600
946
1546
1290
1890
1050
700-1300
680
986
1666
1330
2010
VUCL.E
380
700-1300
260
422
682
475
735
650
700-1300
300
432
732
535
835
1050
700-1300
340
452
792
555
895
Table 17. Weights for type VUCL.
Oil filling
For details of oil filling, consult the appropriate Installation and commissioning guide.
Maintenance
For maintenance, please contact ABB or make sure that personnel performing maintenance are trained and certified by ABB.
Installation and maintenance
Tap-changer
Installation
The tap-changers can be delivered for cover-mounting or
yoke-mounting onto the transformer. For detailed installation
instructions, consult the appropriate Installation and
commissioning guide.
Drying
The tap-changer must be stored indoors and left in its plastic
shipping cover until time for assembly. The tap-changer
should be subjected to drying before taken into service.