- 122 -
000698AG
7 - Operation
T
OOLS section
In the
TOOLS
section it’s possible to access the following sub-menus:
• Dynamic Feed-in Control
• Local I/O Manager
• Country Standard
• Autotest CEI 0-21
• Firmware Update
• Date/Time
Dynamic Feed-in Control
In the
Dynamic Feed-in Control
sub-menu it’s possible to enable the
management of power flows in order to optimize self-consumption or
avoid feeding power to the grid (except during transitory), basing on the
reading of the energy meter:
Installation of energy meter is required. Refer to the section “Connection of the energy meter”
in the manual for the meter connection.
-
Meter:
When a meter device is connected to the inverter, it’s
requested to select the meter model:
1.
None
(where system is installed without meter)
2.
REACT-MTR-1PH
(single-phase)
3.
ABB B23 1PH
(single-phase)
4.
ABB B23 3PH
(three-phase)
Once the meter model is selected, additional requested
fields will appear:
-
METER PHASE: If the METER is three-phase, the
phase to which the inverter is connected must be
selected. (This field will appear only if you select
the ABB B23 3PH meter model)