Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30
4 Operation / 4.2 Servicing work
© Copyright 2018 . All rights reserved.
HZTL2481_EN
Revision C
May 2018
4.2.4
Service work every 8000 … 12000 hours
The inspection and assessment of the rotor and the bearing parts must
be carried out by an official ABB Turbocharging service station.
u
Disassemble turbocharger.
u
Measure clearances.
u
Clean the turbine and compressor wheels and inspect for damage.
u
Clean the turbine and compressor casings and inspect for any cracks
and erosion or corrosion.
u
Clean bearing casing and blow air through oil ports.
u
Clean nozzle ring and check for cracks and erosion.
u
Inspect and assess bearing parts and rotor.
4.2.5
Service work every 24000 … 36000 hours
The replacement of bearing parts and the inspection and assessment of
the rotor must be carried out by an ABB Turbocharging Service Station.
u
Disassemble turbocharger.
u
Clearance measurement.
u
Clean the turbine and compressor wheels and inspect for damage.
u
Clean turbine casing as well as compressor casing and check for any
cracks and erosion or corrosion.
u
Clean bearing casing and blow air through oil ports.
u
Clean nozzle ring and check for cracks and erosion.
u
Dismantle, inspect and balance the rotor.
u
Replace plain bearings with original parts from ABB Turbo Systems.
Page
37
/
136