Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30
2 Safety / 2.6 Safe operation and maintenance
© Copyright 2018 . All rights reserved.
HZTL2481_EN
Revision C
May 2018
Safety during disassembly, assembly, maintenance and
troubleshooting
u
Always perform the specified adjustments, servicing as well as in-
spection work and observe inspection intervals.
u
Inform operating personnel about all service and repair work before
beginning.
u
Before opening a cover or removing a protective device on a tur-
bocharger, the engine must be switched off and the turbocharger
must have come to a standstill.
u
Ensure that the supply of oil is interrupted, especially with an external
oil supply.
u
Put the engine into operation only after all parts have been refitted
properly.
CAUTION
Mechanical work on the turbocharger
Possible damage to or destruction of components on the turbocharger.
u
Perform only those tasks that are described in this manual.
u
Perform work only for which training has been carried out.
Safety when taking out of operation or preparing for mothballing
u
Secure the rotor so it cannot turn. The rotor can turn on its own from
the force of the stack draught.
u
Clean the turbocharger before mothballing it.
u
Observe the material safety data sheet for the cleaning and moth-
balling agents.
u
Wear personal protective equipment (PPE) according to the material
safety data sheet.
Page
19
/
136