Voltage tester
Procedure
1. Measure the AC voltage between the terminals on the surge protection device switch:
•
R, S and T to N
•
R to S
•
R to T
•
S to T
Use the voltage tester.
Note: The surge protection device switch shows the indications
R, S, T
and
N.
4.6.3
Measure the DC voltage
Preliminary requirements
1.
•
Only do this procedure if a
different procedure refers to
this procedure.
•
Voltage tester
Procedure
1. Measure the DC voltage between the
output terminals:
•
Power module group output 1- (A) to
power module group output 1+ (B)
•
Power module group output 2- (C) to
power module group output 2+ (D)
•
EV charge cable 1 output - (E) to EV
charge cable 1 (F)
•
EV charge cable 2 output - (G) to EV
charge cable 2 (H)
Use the voltage tester.
4.7
Remove condensation from the cabinet
If the EVSE is off for more than two hours, condensation can occur.
Note:
G
E
F
H
D
B
C
A
Operation