
5.4.3
Remove the cabinet from the pallet
Preliminary requirements
•
Open spanner
Procedure
1. Remove the fasteners (A).
2. Discard the fasteners and the pallet.
.
5.5
Mechanical installation
5.5.1
Mechanical installation procedure
Preliminary requirements
1.
The cabinet is above the foundation.
Procedure
1. Open the cable inlet and remove the cable gland. Refer to section
.
2. Guide the cables through the openings in the cable guide plate. Refer to section
.
3. Install these parts:
1. Cabinet on the foundation. Refer to section
.
2. Border covers. Refer to section
.
5.5.2
Open the cable inlet and remove the cable gland
Preliminary requirements
•
Open spanner
A
Installation
28
BCM.S1102.0-EN | 001