
ABB | SACE Emax 2
Management operations | 4 - Environmental conditions
29 | © 2019 ABB | 1SDH001000R0002 - ECN000109166 - Rev. D
Positioning anchor plates
The diagram below indicates the distance for positioning the first anchor plate according to the circuit-
breaker type and the peak current:
100/
3.94
150/
5.91
200/
7.87
250/
9.84
300/
11.81
350/
13.78
400/
15.75
450/
17.72
500/
19.69
40
60
80
100
120
140
160
180
200
220
240
260
280
300
E2.2
E4.2
E6.2
L
[m
m
]
(1)
Ipk [kA]
(2)
Figure 71
L
L
(1): distance of the first anchor plate from the circuit-breaker terminals
(2): peak current
Positioning anchor plates E4.2-A 3600A
The anchor plates for E4.2-A 3600A circuit-breakers must be positioned as indicated in the figure.
30mm max.
Figure 72