5.1.
Mounting instructions for snap ferrite ring
Install the snap ferrite ring around the wires for current/voltage measurement
as follows:
1. Place the snap ferrite ring on a flat surface. To open the ring, use the key
included in the package by pressing it gently into the key holes on the
snap ferrite ring as shown in Fig. 5.1.-1.
A040185
Fig. 5.1.-1
Opening the snap ferrite ring before installation
2. Remove the key from the keyholes by carefully pulling it out with one
hand while holding the snap ferrite ring with the other hand.
3. Place the snap ferrite ring around the wires for current/voltage
measurement and lock the ring by closing it. The snap ferrite ring
should be installed as close to the terminal block as possible. Fig. 5.1.-2
shows the preferred position of the snap ferrite ring after installation.
If the protection relay is installed in a place where it is subject to
vibration, such as on marine applications, the snap ferrite ring
needs to be attached to a stationary part of the switch gear
cubicle. This can easily be done by fastening the snap ferrite ring
to the cubicle wall with a screw.
32
RE_ 610
Protection Relay
Installation Manual
1MRS752265-MUM